In a Voyage Charter, laytime usually starts with the Notice of Readiness (NOR). If the notice is invalid, the shipowner loses time they were entitled to claim, and a charterer who accepts it carelessly loses the right to object.
Three conditions for a valid Notice of Readiness
Arrival at the contractual destination. The vessel must have reached the point named in the Charter Party (C/P) to count as an “Arrived Ship”. The wording “one safe berth, London” makes the contract a berth charter, while “London, one safe berth” makes it a port charter. Under a berth charter, the notice is valid only after the vessel has berthed. Under a port charter, the vessel must be in the usual waiting area and within the port limits.
The WIBON clause. “Whether In Berth Or Not” (WIBON) effectively turns a berth charter into a port charter, but it usually works only when the berth is occupied by another vessel. It does not help in bad weather, because the owner carries the risk of nautical delay.
Physical readiness. The holds must be clean and suitable for the contract cargo, and the cargo gear must be ready to work without delay as soon as the charterer gives the order. The hold hatches do not have to be open before the notice is issued.
Legal readiness. This condition concerns the vessel itself, not the cargo: customs approval of entry, approval from the police and port guard, and no quarantine problem. The exception is a contract that includes clauses such as WCCON (Whether Customs Cleared Or Not) or WIFPON (Whether In Free Pratique Or Not, meaning whether or not quarantine clearance has been issued).
An invalid notice never becomes valid
A notice issued before the vessel has arrived or become ready does not turn valid by itself once the conditions are met. The owner must issue a fresh notice. The argument that the real delay was caused by port congestion is also usually rejected; the main question is whether the vessel was ready at the moment the notice was issued.
Office hours. Tendering the notice outside the hours set in the contract does not usually void it. The notice takes effect from office hours on the next working day, unless the contract expressly says otherwise.
The risk of cancellation. If the vessel is not ready by the end of the Laydays and Cancelling period (Laycan), the charterer gains the right to cancel the contract. Before the cancelling date stated in the contract, they have no such right. Under a Time Charter, the hold cleanliness clause usually does not invalidate the notice. Instead, it puts the vessel off-hire until the surveyor approves.